Project Description
Which is located at a water depth of 73m with an injection capacity of 180,000 barrels of water per day (bwpd). The platform was aimed to improve the oil recovery factor from 31% to 38%. On-site Installation of Pipe Spools, Hydrotesting, Bolt tensioning, Blasting and painting to meet with clients’ specification.